Because time waits for no one, keeping enclosure time at a minimum was vital in the construction of the Solano County SB 1022 Classroom and Vocational Training Center in Fairfield, Calif. Building codes require the building be enclosed before much of the inside work begins, so Metl-Span’s HPCI Barrier Wall Panels were prescribed to keep construction moving along.