This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies
By closing this message or continuing to use our site, you agree to our cookie policy. Learn More
This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
Building Enclosure logo
search
cart
facebook twitter linkedin youtube instagram Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Building Enclosure logo
  • EMAGAZINE
    • eMagazine
    • Archive Issues
    • Susbcribe
  • NEWS
    • Breaking News
  • PRODUCTS
    • New Products
  • SECTIONS
    • Columns
    • Project Profiles
    • Trade Shows
    • Section Cut
  • TECHNICAL
    • Codes
      • Waterproofing
      • Roofing
    • Details
      • Waterproofing
      • Roofing
  • CONTINUING ED
  • SYSTEM DESIGNS
    • Low-Slope Roofs
    • Pitched Roofs
    • Metal Roofing Materials
    • Waterproofing
    • Sustainability
    • Insulation
    • Exterior Claddings
    • Wall Systems
    • Building Envelope
  • BLOG
    • The BE Blog
  • RESOURCES
    • EDITORIAL CALENDAR
    • DOWNLOAD SPECIFICATIONS
  • MEDIA
    • Podcasts
    • Quizzes
      • Podcasts #2
    • Infographics
    • Videos
    • Polls
    • eBooks
  • ADVERTISE
    • Contact
    • Editorial Calendar
    • Media Kit
  • DIRECTORIES
    • Directory: Blue Book
    • Directory: Roofing Resource
Home » Events » The Elusive Sub-Contractor Responsible for Transitions

Refine your results by

The Elusive Sub-Contractor Responsible for Transitions

KEYWORDS: building performance / construction documents / quality control inspections
Email
Tweet
12/8/20 2:00 pm to 12/8/21 EST
Contact: Varonica

Credits: 1 AIA/HSW; 0.1 IACET CEU*; 1 IIBEC CEH

An in-depth look at the environmental separators for the roof, wall and below-grade assemblies in regards to water control, air leakage control, thermal performance and vapor control. Critical details that typically cause building performance related issues will be focused on the two largest failures of building enclosures: roof-to-wall connections and wall-to-window connections specific to curtain wall systems. A step-by-step look at each critical detail in regards to sequence of construction and the various connections to ensure airtight/watertight and thermally protected details. Real-life photos and job conditions will bring the realities of the construction process to show typical errors found and how they can be addressed correctly.

Learning Objectives:

  1. Articulate how transitions impact building enclosure performance through real-life experiences in regards to energy loss, building performance and the sustainability of the system.
  2. Identify and prioritize critical details during the construction document phase to ensure an integrated approach is taken to heat, air, water and vapor control.
  3. Assess each detail in regards to impacts of the four control layers and understand the various options for designing details for a variety of roof, wall and window assemblies.
  4. Through the use of real-life case studies and photos, plan out the proper sequence of construction and identify quality control methods in construction document review to provide corrective action.

 

Sponsored by:

 

Register for this Event

Related Articles

CFSEI Names Recipients of the 2020 and 2021 Award for Distinguished Service

Watts Up: Information Surplus in December Issue

AIA EVP/Chief Executive Officer to Retire in December

Maintaining Transitions Between Components Equals Better Waterproofing for the Entire Building Envelope

Related Products

Building Codes Illustrated: A Guide to Understanding the 2021 International Building Code, 7th Edition

Markup & Profit: A Contractor's Guide Revisited

Building Cost Planning for the Design Team

Subscribe For Free!
  • Subscribe For Free!
  • Sign up for the Newsletter
  • Online Registration
  • Manage My Preferences
  • Registration Customer Service

More Videos

Popular Stories

Figure 3-web.jpg

Waterproofing Penetrations 101

Header - BE 1170x658 June.jpg

State-by-State Energy Codes in Context

Hub-on-Causeway-North-Station-Bret Osswald.jpg

Noise Mitigation for Residential Sites Near Transit

ARW eNews

Poll

Is the CO2 concentration level in the buildings you design of concern to you when you're designing?

Is the CO2 concentration level in the buildings you design of concern to you when you're designing?
View Results Poll Archive

Products

Applying the Building Code: Step-by-Step Guidance for Design and Building Professionals

Applying the Building Code: Step-by-Step Guidance for Design and Building Professionals

See More Products
ARW University

Get our new eMagazine delivered to your inbox every month.

Stay in the know on the latest building & construction industry trends.

SUBSCRIBE TODAY!
  • Resources
    • List Rental
    • Construction Group
    • Survey And Sample
  • Want More
    • Connect
    • Digital Edition
    • eNewsletter
  • Advertise
  • Privacy
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • MANAGE MY PREFERENCES
    • ACCESSIBILITY

Copyright ©2023. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing