Metl-Span HPCI Barrier System Helps Speed up Construction on Award Winning Project
Because time waits for no one, keeping enclosure time at a minimum was vital in the construction of the Solano County SB 1022 Classroom and Vocational Training Center in Fairfield, Calif. Building codes require the building be enclosed before much of the inside work begins, so Metl-Span’s HPCI Barrier Wall Panels were prescribed to keep construction moving along.
The project was voted as 2018’s best by the Metal Building Contractors & Erectors Association in the Educational & Recreational category. The classroom is part of the Solano County correctional program that helps inmates rejoin the workforce. That means all exterior and interior details of the building were inspected by the design team to ensure inmates could find nothing to use as a weapon against an officer or another inmate.